OneIP Header Image

Bau Xeo Industrial Park

General

Bau Xeo Industrial park has a total area of 499,7993 hectares, planned in Song Trau Commune, Tay Hoa Commune, Doi 61 Commune and Trang Bom Town, Trang Bom District, Dong Nai Province, including two areas located along both sides of the National Highway. 1A: Zone 1 north of National Highway 1A with an area of 188,4168 hectares, zone 2 south of National Highway 1A with an area of 311,3825 hectares.

Industry:

Utility Capacity

  • Power Supply 110/22kV

  • Water Supply Capacity 12000

  • Power Supply Capacity 126 MVA

  • Minimum Leasing Area 10.000 m2

  • Electricity Price (Normal Hour) 0,10 $/kW

  • max_power_charges 0,10 $/kW

  • Wastewater Treatment Capacity 8000

Map

Transportation

Port

  • Phu My Port 42km

  • Go Dau Port 40km

Highway

  • Ho Chi Minh City - Long Thanh Expressway 43.3km

Demographic at Đồng Nai

  • Total Area 5.906km2

  • Labor Force 2.013.119

  • Population 3.097.107

  • Average Labor Wage 400 USD/month

  • Provincial Competitiveness Index (PCI) 20/63

Bau Xeo Industrial Park

General Information

  • Est./Exp. years 2007/

Developer

Thong Nhat Joint Stock Company

Others

  • Internal Transportation System
  • Main Internal Transportation Infrastructure:4 lanes

    Sub Internal Transportation Infrastructure:2 lanes

  • Green Coverage Ratio
  • 10 %

Featured Products