Bau Xeo IP
Đồng Nai
Contact for Price
Industry:
- Manufacture of food products
- Manufacture of wood and of products of wood and cork, except furniture; manufacture of products of straw and plaiting materials;
- Manufacture of textiles
- Manufacture of metals
General
Bau Xeo Industrial park has a total area of 499,7993 hectares, planned in Song Trau Commune, Tay Hoa Commune, Doi 61 Commune and Trang Bom Town, Trang Bom District, Dong Nai Province, including two areas located along both sides of the National Highway. 1A: Zone 1 north of National Highway 1A with an area of 188,4168 hectares, zone 2 south of National Highway 1A with an area of 311,3825 hectares.
Utility Capacity
-
Power Supply 110/22kV
-
Power Supply Capacity 126 MVA
-
Water Supply Capacity 12.000 m3/day
-
Wastewater Treatment Capacity 8000
Others
-
Firefighting & Prevention Có hệ thống PCCC
Map
Transportation
Port
-
Phu My Port 42km
-
Go Dau Port 40km
Highway
-
Ho Chi Minh City - Long Thanh Expressway 43.3km
Demographic at Đồng Nai
-
Total Area 5.906km2
-
Labor Force 2.013.119
-
Population 3.097.107
-
Average Labor Wage 400 USD/month
-
Provincial Competitiveness Index (PCI) 20/63
Bau Xeo Industrial Park
General Information
-
Year of Establishment 2007
-
Annual Rental Price 67 USD/m2
Region
Developer
Thong Nhat Joint Stock Company
Others
- Internal Transportation System
- Green Coverage Ratio
Main Internal Transportation Infrastructure: 4 lanes
Sub Internal Transportation Infrastructure: 2 lanes