Ho Nai - Dong Nai

Đang hoạt động
Rental Factory Fill Rate82 Land Lease Term: 31 Year

Đồng Nai

Contact for Price

163.000 m2

Key specification

  • Clear Height 7m

  • Floor Loading Capacity 2 ton/sqm

Industry:

  • Manufacture of computer, electronic and optical products
  • Manufacture of wood and of products of wood and cork, except furniture; manufacture of products of straw and plaiting materials;
  • Manufacture of textiles
  • Manufacture of pharmaceuticals, medicinal chemical and botanical products

General

Established since 2005, Ho Nai (Phase I) Industrial Park Dong Nai is an industrial real estate project by HO NAI INDUSTRIAL ZONE JOINT - STOCK COMPANY with a total area of 2260000.00 hectares. Ho Nai (Phase I) Industrial Park offers quality products including Ready-built factory (RBF), Ready-built warehouse (RBW), Built-to-suit (BTS), industrial land-lease and rental office space together with a wide array of essential supports for domestic and international tenants. Ho Nai (Phase I) Industrial Park’s strategic location in Dong Nai key economic zone allows for convenient access routes to the abundant local labor force, airports, seaports, and important consumer markets.

Utility Capacity

  • Power Supply 110/22KV

  • Power Supply Capacity 40 MVA

  • Water Supply Capacity m3/day

  • Wastewater Treatment Trạm xử lý nước thải tập trung giai đoạn I công suất 4.000m3/ngày đêm, xử lý đạt giá trị giới hạn tại cột A của Quy chuẩn QCVN 40: 2011/BTNMT và trong tương lai sẽ đầu tư nâng cấp lên công suất 10.000m3/ngày đêm.

Floor - Roof - Office - Production areas

  • Roofs count 4

  • Min Leasing Area 1.464 m2

  • Leasable area 51.518 m2

  • Min leasing charge $5

Others

  • Fire protection note Theo qui định PCCC

  • Power Supply Capacity 100kva/1000m2

  • Firefighting & Prevention Theo qui định PCCC

  • Clear Height 7

Map

Đường số 6, Giai đoạn 2, Khu công nghiệp Hố Nai, phường Phước Tân, thành phố Biên Hòa, tỉnh Đồng Nai, Việt Nam

Demographic at Đồng Nai

  • Total Area 5.906km2

  • Labor Force 2.013.119

  • Population 3.097.107

  • Average Labor Wage 400 USD/month

  • PCI 20/63

Ho Nai (Phase I) Industrial Park

General Information

  • Fill Rate 82

  • Year of Establishment 2005

Developer

HO NAI INDUSTRIAL ZONE JOINT - STOCK COMPANY

Others

  • Internal Transportation
  • Main Intenal Roads: 4

    Sub Internal Roads: 2

  • Green Coverage Ratio
  • 13 %