Factorry KTG Industrial Tam Phuoc B
Đang hoạt độngĐồng Nai
Contact for Price
Key specification
-
Clear Height 8m
-
Floor Height 4m
-
Floor Loading Capacity 2 ton/sqm
Industry:
- Manufacture of fabricated metal products, except machinery and equipment
- Manufacture of pharmaceuticals, medicinal chemical and botanical products
- Manufacture of computer, electronic and optical products
- Manufacture of textiles
- Manufacture of leather and related products
General
– Located in the southern key economic region is a dynamically developing economic region, attracting many domestic and foreign industrial investment projects.– Located in the master planning area of industrial parks in Dong Nai province, the An Phuoc industrial park and the Doc 47 industrial park form a large-scale concentrated industrial cluster along National Highway 51.– Attached to Tam Phuoc residential area, Tam Phuoc new urban area and Long Thanh town is a place to provide labor resources and other issues related to the industrial park.
Utility Capacity
-
Power Supply 110/22KV
-
Power Supply Capacity 63 MVA
-
Water Supply Capacity m3/day
-
Wastewater Treatment Nhà máy xử lý nước thải có công suất 7.000 m3/ngày đêm, xử lý nước thải đạt quy chuẩn kỹ thuật quốc gia về nước thải công nghiệp QCVN 40: 2011-BTNMT
Floor - Roof - Office - Production areas
-
Roofs count 2
-
Acreage Office - 1st flr. 578 m2
-
Acreage Production 14.731 m2
-
Office Production rate 4 %
-
Min Leasing Area 6.700 m2
-
Leasable area 15.309 m2
-
Min leasing charge $4
-
Min leasing month 36 months
-
Max leasing charge 5
Others
-
Fire protection note Cuộn vòi chữa cháy. Chi nhánh dự phòng để người thuê lắp đặt vòi phun nước.
-
Office Fire Protection Cuộn vòi chữa cháy. Chi nhánh dự phòng để người thuê lắp đặt vòi phun nước.
-
Power Supply Capacity 800 kVA
-
Firefighting & Prevention Cuộn vòi chữa cháy. Chi nhánh dự phòng để người thuê lắp đặt vòi phun nước.
-
Prod Floor Material Bê tông cốt thép với chất làm cứng bề mặt để ngăn bụi bẩn và vết nứt
-
Floor height 0
-
Floor Height 4
-
Clear Height 8
-
Prod Roof Material Tôn cách nhiệt
Map
Đường số 3, khu công nghiệp Tam Phước, Long Thành, Đồng Nai
Demographic at Đồng Nai
-
Total Area 5.906km2
-
Labor Force 2.013.119
-
Population 3.097.107
-
Average Labor Wage 400 USD/month
-
PCI 20/63
Tam Phuoc Industrial Park
General Information
-
Fill Rate 100
-
Year of Establishment 2003
Region
Developer
Công ty cổ phần phát triển khu công nghiệp Tín Nghĩa
Others
- Internal Transportation
- Green Coverage Ratio
Main Intenal Roads: 4
Sub Internal Roads: 2