Power Supply 110/22kV
Water Supply Capacity 15000
Power Supply Capacity 80 MVA
Min Leasing Area 10.000 m2
Wastewater Treatment 6500
Tan Cang - Cat Lai 67km
Total Area 4.035km2
Labor Force 896.800
Population 1.178.000
Average Labor Wage 325 USD/month
PCI 24/63
THANH THANH CONG INDUSTRIAL ZONE JOINT - STOCK COMPANY
Main Intenal Roads:4 lanes
Sub Internal Roads:2 lanes
10 %