Power Supply 110/22kV
Water Supply Capacity 5000
Power Supply Capacity 60 MVA
Min Leasing Area 10.000 m2
Electricity Fee (Normal Hr) 0,30 $/kW
Max Power Charge 0,30 $/kW
Wastewater Treatment 3000
Total Area 3.312km2
Labor Force 921.229
Population 1.181.835
Average Labor Wage 194 USD/month
PCI 51/63
Main Intenal Roads:4 lanes
Sub Internal Roads:2 lanes
10 %