Power Supply 110/22kV
Water Supply Capacity 7500
Power Supply Capacity 40 MVA
Min Leasing Area 2.500 m2
Electricity Fee (Normal Hr) 0,10 $/kW
Max Power Charge 0,10 $/kW
Wastewater Treatment 3000
Hai Phong Port 147km
Total Area 3.359km2
Labor Force 5.562.550
Population 8.050.000
Average Labor Wage 268 USD/month
PCI 9/63
NOI BAI DEVELOPMENT CORPORATION LIMITED
Main Intenal Roads:4 lanes
Sub Internal Roads:2 lanes
10 %