Power Supply 110/22kV
Water Supply Capacity 10000
Power Supply Capacity 50 MVA
Min Leasing Area 10.000 m2
Electricity Fee (Normal Hr) 0,10 $/kW
Max Power Charge 0,10 $/kW
Wastewater Treatment 5000
Total Area 3.537km2
Labor Force 1.234.888
Population 1.908.352
Average Labor Wage 177 USD/month
PCI 19/63
An Giang Economic Zone Management Board
Main Intenal Roads:4 lanes
Sub Internal Roads:2 lanes
10 %