Power Supply 110/22kV
Water Supply Capacity 4000
Power Supply Capacity 25 MVA
Min Leasing Area 10.000 m2
Electricity Fee (Normal Hr) 0,10 $/kW
Max Power Charge 0,10 $/kW
Wastewater Treatment 2500
Total Area 2.695km2
Labor Force 1.200.000
Population 2.456.000
Average Labor Wage 290 USD/month
PCI 4/63
Est./Exp. years 1997/
HUNG THINH TRADING MANUFACTURE CONSTRUCTION JOINT STOCK COMPANY
Main Intenal Roads:6 lanes
Sub Internal Roads:2 lanes
1.24 %