General
Located in the southern key economic area, Cai Mep Industrial Park with an area of 670 hectares will be an ideal location for domestic and foreign investors looking for attractive investment opportunities. Investors will give Cai Mep Industrial Park a special geographical location of the IP with a favorable and effective investment environment, only 70 km from Ho Chi Minh City and Ho Chi Minh City. Vung Tau 40km. Connecting with national arterial roads, with deep-water seaport systems in Ba Ria Vung Tau province and Long Thanh international airport in the future, it will be a gateway for trade with coastal provinces in the country... In particular, the southwest area of Cai Mep Industrial Park is bordered by Cai Mep River and Thi Vai River, which connects to the East Pacific Ocean. Therefore, Cai Mep Industrial Park is associated with the national deep-water port system, which can receive ships of up to 80,000 DWT... This is the place that best meets the demand for goods circulation, which is the factor that the operators investment not to be missed. About 3 km from National Highway 51 with a relatively complete infrastructure system and professional support service network, Cai Mep Industrial Park can receive many different investment projects in all fields: industrial heavy industries requiring specialized ports such as petroleum, gas, chemicals, metallurgy; light industry, mechanical engineering, ship repair, agricultural and food processing, ports, warehouses. Currently, Cai Mep Industrial Park has 08 investors with an area of more than 150 ha, with projects: Interflour Vietnam flour mill (28.1 ha), LPG plant and Condensate project (40.8 ha)… Coming to Cai Mep Industrial Park, investors will have the opportunity to make optimal use of developed infrastructure, competitive costs and especially the location of a deep-water port. Cai Mep Industrial Park with the strength of the best geographical location, we are confident to be the first choice of your business.
Utility Capacity
-
Power Supply 110/22kV
-
Water Supply Capacity 60000
-
Power Supply Capacity 64 MVA
-
Min Leasing Area 10.000 m2
-
Electricity Fee (Normal Hr) 0,10 $/kW
-
Max Power Charge 0,10 $/kW
-
Wastewater Treatment 13000
-
Total Area 1.987km2
-
Labor Force 934.800
-
Population 1.200.000
-
Average Labor Wage 486 USD/month
-
PCI 15/63
Developer
SAIGON CONSTRUCTION CORPORATION
Others
- Internal Transportation
Main Intenal Roads:4 lanes
Sub Internal Roads:2 lanes
- Green Coverage Ratio
12.19 %