OneIP Header Image

Long Thanh (Phase I) High-Tech Industrial Park

General

Long Thanh (Phase I) High-Tech Industrial Park Dong Nai is an industrial real estate project by AMATA CITY LONGTHANH JOINT STOCK COMPANY with a total area of 4100000.00 hectares. Long Thanh (Phase I) High-Tech Industrial Park offers quality products including Ready-built factory (RBF), Ready-built warehouse (RBW), Built-to-suit (BTS), industrial land-lease and rental office space together with a wide array of essential supports for domestic and international tenants. Long Thanh (Phase I) High-Tech Industrial Park’s strategic location in Dong Nai key economic zone allows for convenient access routes to the abundant local labor force, airports, seaports, and important consumer markets.

Utility Capacity

  • Power Supply 110/22kV

  • Water Supply Capacity 16000

  • Power Supply Capacity 103 MVA

  • Min Leasing Area 10.000 m2

  • Electricity Fee (Normal Hr) 0,10 $/kW

  • Max Power Charge 0,10 $/kW

  • Wastewater Treatment 12000

Map

Transportation

Port

  • Tan Cang - Cat Lai 20km

Highway

  • Ho Chi Minh City - Long Thanh Expressway km

Demographic at Đồng Nai

  • Total Area 5.906km2

  • Labor Force 2.013.119

  • Population 3.097.107

  • Average Labor Wage 400 USD/month

  • PCI 20/63

Long Thanh (Phase I) High-Tech Industrial Park

Developer

AMATA CITY LONGTHANH JOINT STOCK COMPANY

Others

  • Internal Transportation
  • Main Intenal Roads:4 lanes

    Sub Internal Roads:2 lanes

  • Green Coverage Ratio
  • 10 %

Featured Products