Nhà kho SLP Park Yên Phong 2C

Đang xây dựng
Rental Warehouse Fill Rate60 Land Lease Term: 44 Year

Bac Ninh

Contact for Price

Industry:

  • Manufacture of computer, electronic and optical products
  • Other manufacturing

General

Yen Phong 2C Industrial Park and Urban Area was established under the Prime Minister's Decision No. 856 /TTg-CN dated June 28, 2007 with a total planning area of 1,200 hectares, of which the area of the Industrial Park - for production area is 1,000 ha, urban area is 200 ha. Yen Phong II Industrial Park is divided into 3 functional subdivisions including: Subdivision A located in the west of National Highway 3 (151.27 ha); subdivision B is located between QL.3 and DT.277 (282.67 ha); subdivision C is located to the east of DT.277 (221.06 ha). The subdivisions are arranged with full functions and are connected to each other through external traffic axes and the framework technical infrastructure system of the IP. The administrative, commercial and service buildings are arranged along the provincial roads and the main roads of the industrial park.

Utility Capacity

  • Power Supply 110/22KV

  • Power Supply Capacity 2x63 MVA

  • Water Supply Capacity 20 m3/day

  • Wastewater Treatment 17.000 m3/ngày

Floor - Roof - Office - Production areas

  • Leasable area 99.000 m2

Others

Map

Khu Công Nghiệp Yên Phong 2C, Xã Tam Giang, Huyện Yên Phong, Tỉnh Bắc Ninh, Việt Nam

Demographic at Bac Ninh

  • Total Area 823km2

  • Labor Force 1.129.954

  • Population 1.450.518

  • Average Labor Wage 800 USD/month

  • PCI 10/63

Yen Phong 2C Industrial Park

General Information

  • Fill Rate 60

  • Year of Establishment 2018

Region

Developer

VSIP BAC NINH CO., LTD

Others

  • Internal Transportation
  • Main Intenal Roads: 2

    Sub Internal Roads: 2

  • Green Coverage Ratio
  • 11 %