Nhà kho JD Tân Đức

Đang hoạt động
Rental Warehouse Fill Rate47 Land Lease Term: 39 Year

Long An

Contact for Price

101.000 m2

Key specification

  • Clear Height 9m

  • Floor Loading Capacity 3 ton/sqm

Industry:

  • Manufacture of textiles
  • Manufacture of metals
  • Manufacture of paper and paper products

General

The Industrial Park is located in a modern architectural complex including: E-City Industrial Park - Urban Area - Tan Tao University - High quality service, sports and entertainment complex. This is the first large-scale and international-quality advanced complex of the Southern Key Economic Zone.The transport infrastructure system of the Industrial Park is invested in accordance with standards, synchronization, ventilation and safety to ensure the activities of the enterprises.Tan Duc Industrial Park - Urban - Service Complex is located at the Southeast gateway of Ho Chi Minh City with three sides contiguous to three main traffic axes of the region, Provincial Road 830 towards Ben Luc Long An and the Western provinces, provincial road 824 to Cu Chi, Tay Ninh, national highway 22 to Ho Chi Minh City, provincial road 825 connecting provincial road 10 to the center of Ho Chi Minh City. Waterway system with Vam Co Dong River nearby. This is the waterway connecting with the Mekong Delta. Currently, provincial road 10 has been completed with a 42m cross road structure and connects Tan Duc Industrial Park with Ho Chi Minh City with only 12 km, creating favorable conditions for transportation and traffic.

Utility Capacity

  • Power Supply 110/22KV

  • Power Supply Capacity 2x63 MVA

  • Water Supply Capacity 48 m3/day

  • Wastewater Treatment 9.000 m3/ngày

Floor - Roof - Office - Production areas

  • Roofs count 2

  • Acreage Production 55.052 m2

  • Min Leasing Area 6.000 m2

  • Leasable area 55.052 m2

  • Min leasing charge $4

Others

  • Fire protection note Hệ thống phun nước và đầu báo khói

  • Firefighting & Prevention Hệ thống phun nước và đầu báo khói

  • Floor height 1

  • Clear Height 9

Map

KCN Tân Đức, huyện Đức Hòa, tỉnh Long An

Demographic at Long An

  • Total Area 4.492km2

  • Labor Force 1.374.829

  • Population 1.763.754

  • Average Labor Wage 355 USD/month

  • PCI 3/63

Tan Duc - Phase I Industrial Park

General Information

  • Fill Rate 47

  • Year of Establishment 2013

Region

Developer

Công ty Cổ phần Đầu tư Tân Đức

Others

  • Internal Transportation
  • Main Intenal Roads: 2

    Sub Internal Roads: 2