BWID Factory VSIP Hai Duong
Hai Duong
Contact for Price
426.000 m2
Industry:
- Manufacture of wearing apparel
- Manufacture of leather and related products
- Manufacture of rubber and plastics products
- Manufacture of food products
- Manufacture of motor vehicles and other motor vehicles
General
Cam Dien - Luong Dien Industrial Park, now known as VSIP Hai Duong Industrial Park, was established by Hai Duong Provincial People's Committee in 2008 with an initial planning area of 205.8 hectares with the investor implementing the project being Phuc Hung Co., Ltd. However, it was not until 2010 that the investor received the first 150 ha of land to be handed over to the project, but then it was delayed many times to adjust the planning. In 2015, the project was transferred to a new investor, VSIP Hai Duong Co., Ltd and since then it has been called VSIP Hai Duong Industrial Park, and the planning area has been reduced to more than 150 hectares.
Utility Capacity
-
Power Supply 110/22kV
-
Power Supply Capacity 30 MVA
-
Water Supply Capacity 10.000 m3/day
-
Wastewater Treatment Capacity 3000
Floor - Roof - Office - Production areas
-
Minimum Leasing Area 600 m2
-
leasable_area 10.000 m2
Others
-
Power Supply Capacity 0.096MVA - 0.332MVA/ nhà xưởng
-
Firefighting & Prevention công tắc khẩn cấp, hộp đựng vòi cứu hỏa, bình chữa cháy
Map
Demographic at Hai Duong
-
Total Area 1.662km2
-
Labor Force 1.071.000
-
Population 1.916.774
-
Average Labor Wage 291 USD/month
-
Provincial Competitiveness Index (PCI) 47/63
Cam Dien - Luong Dien Industrial Park
General Information
-
Year of Establishment 2008
-
Annual Rental Price 85 USD/m2
Region
Developer
VSIP HAI DUONG CO., LTD
Others
- Internal Transportation System
- Green Coverage Ratio
Main Internal Transportation Infrastructure: 4 lanes
Sub Internal Transportation Infrastructure: 2 lanes